Solar Photovoltaic (Phase II) Project

Summary

SCH Number
2016058268
Public Agency
California State University, Fullerton
Document Title
Solar Photovoltaic (Phase II) Project
Document Type
NOE - Notice of Exemption
Received
Posted
5/23/2016
Document Description
The Solar Photovoltaic (Phase II) Project will install a 3.30 MW DC rated PV system on campus. The goal of the project is to utilize a third-party Solar License and Power Purchase Agreement (SLPPA) to purchase renewable energy at below market utility rates for a period of 19 years and 11 months. The Solar PV system will be installed on the upper decks of the Nutwood Parking Structure and State College Parking Structure. The solar panels (modules) will be mounted over long-span louvered canopy "carport" steel structures. 100% of the high-efficiency solar panels will be south-facing and tilted at 10 degrees to maximize solar power generation. The project will also include a .65 MW DC rated PV system at College Park West.

Contact Information

Name
Stephen Chamberlain
Agency Name
California State University, Fullerton
Contact Types
Lead/Public Agency

Location

Counties
Orange

Notice of Exemption

Exempt Status
Statutory Exemption
Type, Section or Code
S:21080.35
Reasons for Exemption
Under the cited statute, qualifying rooftop solar photovoltaic panels are exempt from CEQA review.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print