Ione Road Bridge Over Buckeye Creek Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2017-0198-R2)
3 Documents in Project
Summary
SCH Number
2016042038
Lead Agency
Sacramento County
Document Title
Ione Road Bridge Over Buckeye Creek Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2017-0198-R2)
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2017
Present Land Use
Ag/AG80/Gen Ag
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0198-R2, pursuant to section 1602 of the fish and Game Code to the project Applicant, Sacramento County.
Project is limited to the replacement of the Ione Road bridge over Buckeye Creek. The replacement bridge will be a single span precast, pre-stressed wide-flange girder bridge on seat abutments with 12 inch "H" piles. The replacement will provide two 12-foot lanes with six-foot paved shoulder and barrier rail on both sides for a total width of 40 feet. The scope of work from this project includes bridge demolition, channel slope protection, roadway approach work, bridge construction, installation of metal beam guardrail and bridge railings. The total length of the project is expected to be 500-linear feet, which includes a new 80-foot long bridge with approx. 200 feet of roadway approach work on each side.
Contact Information
Name
Tanya Sheya
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Sacramento
Cross Streets
Meiss Rd/Ione Rd
Total Acres
0.5
State Highways
16,124
Waterways
Buckeye Creek
Township
7n
Range
8e
Section
25
Base
MtDiablo
Other Location Info
Ione
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.