Piru Spreading Grounds Solar Project

3 Documents in Project

Summary

SCH Number
2016041072
Lead Agency
United Water Conservation District
Document Title
Piru Spreading Grounds Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2016
Present Land Use
GPD: Open Space Z: OS 80
Document Description
The proposed project is a fenced and gated 2.0 MW alternating current (MW-AC) or 2.4 MW direct current (MW-DC) solar photovoltaic (PV) energy generation facility. The facility would consist of 5,780 photovoltaic modules, 1,192 piers, 8 drive motors, and 24 combiner boxes. The facility would be connected to Southern CA Edison's electricity grid at the existing utility pole location on CA-126 (Pole ID No. 4215667F) via an underground utility trench approximately 795 lf in length. To support the additional load, the existing wood utility pole would be replaced with a steel pole. Solar panels would occupy approximately 12 acres of the 21.52 acre site and would have a max height of 10 ft and would be mounted on piers. The project would also include perimeter fencing, access gate, and 12 ft wide maintenance and access road.

Contact Information

Name
James Grisham
Agency Name
United Water Conservation District
Contact Types
Lead/Public Agency

Location

Counties
Ventura
Cross Streets
CA 126/ Main St
Zip
93060
Total Acres
21.51
Parcel #
057-0-020-145
State Highways
CA 126
Schools
Piru ES
Waterways
Santa Clara River, Piru Creek
Township
4N
Range
18W
Section
29
Other Location Info
Piru

Notice of Determination

Approving Agency
United Water Conservation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes