Project Jupiter Distribution Warehouse, Site Plan Review No. 2015-01

4 Documents in Project

Summary

SCH Number
2016041058
Lead Agency
City of Apple Valley
Document Title
Project Jupiter Distribution Warehouse, Site Plan Review No. 2015-01
Document Type
NOD - Notice of Determination
Received
Posted
1/18/2017
Present Land Use
Currently vacant. Z and GPD: Specific plan (adopted North Valley Apple Valley Industrial Specific Plan)
Document Description
The proposed 106.5 acre parcel to accommodate a 1,360,875 sq. ft. distribution center and associated ancillary facilities. The distribution warehouse will consist of a single, 45 foot high building consisting of primarily of warehouse space. Ancillary office space, including administration, shipping and receiving offices, are included in the building envelop. Separate guard house (510 sq. ft.) and fire pump house (1,080 sq. ft.) building are proposed on the east side of the site, at the project entrance. Parking areas, located on the east and south sides of the site. The site plan has also been designed to include storm water retention facilities on the west side of the site. Project also includes off-site improvements. These include roadway improvements to Navajo Road, Lafayette Street, and Dachshund Avenue; water main relocation and extensions on the frontage roadways; and undergrounding of power lines on Navajo Road. The proposed project occurs within the boundary of the North Apple Valley Industrial Specific Plan, which was adopted by the Town in Oct. of 2006. At that time, the town also certified an EIR for the entire Specific Plan. The Town has then prepared a subsequent MND/IS for the Project Jupiter Distribution Warehouse project, which tiers off of the Specific Plan EIR (SCH#2006031112). This EIR was prepared to review the environmental constraints and opportunities associated with imposing mitigation measures, the EIR was designed to be used as an information database to facilitate the streamlining, or tiering of the environmental review process for subsequent projects proposed within the Specific Plan boundary. The proposed project is consistent in size, land use, intensity and design with the development previously anticipated, analyzed, and approved as part of the Specific Plan and EIR. Because the proposed project is within the scope of the previously certified EIR, and consistent with the requirements of CEQA Guidelines Section 15162, a subsequent MND/IS has been prepared to examine the proposed project in the light of the Specific Plan EIR in order to determine if the proposed project would result in any impacts greater than those previously analyzed and disclosed.

Contact Information

Name
Carol Miller
Agency Name
City of Apple Valley
Contact Types
Lead/Public Agency

Location

Cities
Apple Valley
Counties
San Bernardino
Cross Streets
Navajo Rd and Lafayette St
Zip
92307
Total Acres
106.5
Parcel #
046-323-107, -108, -110, -160; 046-323-126, -127, -128; 046-323-142, -143
Airports
Apple Valley
Township
6N
Range
3W
Section
21
Base
SBBM

Notice of Determination

Approving Agency
Town of Apple Valley Planning Division
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print