GPA15-003, SPA15-005, TTM 36427R, PP06-009M2

2 Documents in Project

Summary

SCH Number
2016041055
Lead Agency
City of Corona
Document Title
GPA15-003, SPA15-005, TTM 36427R, PP06-009M2
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2016
Present Land Use
HDR and M-1
Document Description
Application to amend the General Plan designation on 1.1 acres from LI (Light Industrial) to HDR (High Density Residential) located on the south side of Harrington Street, approx. 1,500 feet east of Lincoln Ave. SPA15-005: Application to amend the Township in Corona Specific Plan (SP82-1) to include 1.1 acres of currently zoned M-1 (Light Manufacturing) property into Planning Area 9 with an HDR designation and reduce the maximum dwelling units in Development Area (DA) 9 located on the south side of Harrington Street, approx. 1500 east of Lincoln Ave. TTM 36427R: Re-submitted Tentative Tract Map 36427, a subdivision proposal to create one lot on 7.77 acres for residential condominium purposes located on the southeast corner of Lincoln Ave. and Harrington Street in the HDR designation of Township in Corona Specific Plan (SP82-1). PP06-009M2: Application to modify Precise Plan 06-009 to construct a multi-family residential complex consisting of 36 buildings accommodating 148 residential units on 7.77 acres in the HDR designation of the Township in Corona Specific Plan (SP82-1) located at the southeast corner of Lincoln Ave. and Harrington Street.

Contact Information

Name
Sandra Yang
Agency Name
City of Corona
Contact Types
Lead/Public Agency

Location

Cities
Corona
Counties
Riverside
Cross Streets
Lincoln Ave and Harrington St
Zip
92880
Total Acres
7.77
Parcel #
119-190-022, -025, -029
State Highways
SR-91
Railways
Metrolink-SCRRA
Airports
Corona Municipal
Schools
Parkridge ES, Auburndale Inter., Washington ES
Waterways
Temescal Creek
Township
3S
Range
7W
Section
23
Base
CoronaN

Notice of Determination

Approving Agency
City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print