Ramona Boulevard Grade Crossing Safety Improvement Program

Summary

SCH Number
2016038168
Public Agency
Southern California Regional Rail Authority
Document Title
Ramona Boulevard Grade Crossing Safety Improvement Program
Document Type
NOE - Notice of Exemption
Received
Posted
3/11/2016
Document Description
The proposed project consists of the installation of safety improvements at the intersection of the Metrolink Commuter System at Ramona Boulevard and Downing Avenue within the City of Baldwin Park. Over a period of approximately 8 months, the grade crossing improvements would be installed within existing railroad track and road rights-of-way at the Ramona Boulevard intersection. The proposed safety improvements are considered to be an essential component in providing maximum safety for pedestrian and vehicular traffic crossing the Ramona Bouldvard intersection in addition to Metrolink trains and passengers.

Contact Information

Name
Darrell Maxey
Agency Name
Southern California Regional Rail Authority
Contact Types
Lead/Public Agency

Location

Cities
Baldwin Park
Counties
Los Angeles

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301(b)(f)
Reasons for Exemption
The proposed safety improvements have no potential to cause significant adverse effects on the environment and will ensure adequate facilities have been determined to support safe and efficient regional rail operations by the SCRRA.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print