Kings River Crossing
2 Documents in Project
Summary
SCH Number
2016028407
Public Agency
Empire West Side Irrigation District
(EWSID)
Document Title
Kings River Crossing
Document Type
NOE - Notice of Exemption
Received
Posted
2/24/2016
Document Description
A 36" diameter reinforced concrete pipeline will be installed across the Kings River channel and through the existing 6-7 foot high levees at a location 1 mile downstream of the Jackson Avenue bridge in Kings County to simplify and improve the landowner's current irrigation operations.
Contact Information
Name
Roger L. Reynolds
Agency Name
Empire West Side Irrigation District
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Counties
Kings
Township
19S
Range
19E&20
Section
25&30
Other Location Info
Startford
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S:15304
Reasons for Exemption
The project is exempt because it is for agricultural purposes, will involve only minor trenching and backfilling, the land surface within the dry river channel will only be temporarily impacted and will be restored to the pre-construction conditions with negligible, i.e. no permanent effects on the environment. CDFW submitted a letter stating the work will not adversely affect existing fish and wildlife resources.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.