Old 44 Drive at Oak Run Creek Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2016022029
Lead Agency
Shasta County
Document Title
Old 44 Drive at Oak Run Creek Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2017
Present Land Use
LAnd Use: Bridge Zoning: Limited Residential and Designated Floodway ; GP designation; Rural Residential
Document Description
The project entails replacement of the existing bridge over Oak Run Creek on Old 44 Drive with a new bridge on the same alignment. The existing single-span, 82.6 foot long by 20 foot wide reinforced concrete deck/steel girder bridge would be replaced with a new single-span, 122-foot long by 32.33-foot wide reinforced concrete box girder bridge. The new bridge abutments would be located approx. 16 feet north and 28 feet south of the existing bridge abutments, which would be removed. It is anticipated that the bridge foundation would consist of driven steel H-piles and pile caps. Both approaches to the bridge would require +/- 200 feet of roadwork. The purpose of the project is to provide a safe facility, hazardous waste property, or hazardous waste disposal site. The project site is located in Millville, CA.

Contact Information

Name
Stuart Davis
Agency Name
Shasta County
Contact Types
Lead/Public Agency

Location

Counties
Shasta
Cross Streets
Old 44 Drive and Manzano Way
Zip
96062
Total Acres
+/- 1.5
Parcel #
Various
State Highways
44
Schools
Millville ES
Waterways
Oak Run Creek
Township
31N
Range
3W
Section
3
Base
MDMB
Other Location Info
Millville

Notice of Determination

Approving Agency
Shasta County Dept. of Public Works
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print