Interim Measures Work Plan and Post Closure Permit for Solar Turbines Incorporated, Harbor Drive Facility, 2200 Pacific Highway, San Diego

3 Documents in Project

Summary

SCH Number
2016021097
Lead Agency
Department of Toxic Substances Control
Document Title
Interim Measures Work Plan and Post Closure Permit for Solar Turbines Incorporated, Harbor Drive Facility, 2200 Pacific Highway, San Diego
Document Type
NEG - Negative Declaration
Received
Present Land Use
Mixed Residential, Commercial, and industrial land use
Document Description
The proposed project is (1) provide hydraulic control at the site's property boundary to prevent chemicals from migrating offsite, (2) conduct groundwater monitoring in accordance with post-closure requirements specified in CA Code of Regulations, title 22, division 4.5, chapter 14, article 6, and (3) maintain the integrity of the existing structures/covers of seven formerly closed hazardous waste management units.

Contact Information

Name
Chia Rin Yen
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
W. Laurel St. and W. Hawthorn
Zip
92705
Total Acres
27
Parcel #
760-007-2400
State Highways
5
Airports
SD Int'l Airport
Schools
Washington Elem.
Waterways
San Diego Bay
Township
16S
Range
3W
Section
30

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Caltrans, Division of Aeronautics, Department of Water Resources, Office of Emergency Services, California, Resources Agency, Resources, Recycling and Recovery
Development Types
Other (post-closure monitoring and site remediation)
Local Actions
Post-closure hazardous Waste Facility Permit and Interim Measure
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Schools/Universities, Solid Waste, Transportation, Wildlife, utilities and services systems

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print