Baker Pump Station Project

2 Documents in Project

Summary

SCH Number
2016011036
Lead Agency
El Toro Water District
Document Title
Baker Pump Station Project
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2016
Present Land Use
Zoning:Multi-Family Dwelling (R2)/General Plan: Low Medium Density Residential (7 to 15 DUs/Net AC)
Document Description
ETWD proposes to upgrade the existing Baker Pump Station to deliver a constant flow of 5.0 cubic feet per second into the ETWD's R-6 Pressure Zone (R-6 Zone). The Baker Pump Station is located in the ETWD's R-6 Zone. The proposed project would include demolition of the existing pump station building and construction of a new pump station on the same parcel. Pump station improvements include mechanical and electrical upgrades would upsize this pipeline to 16-inch pipeline to supply suction pressure to the pump station. The proposed 16-inch diameter pipeline would be installed from the proposed pump station building to the tee in El Toro Road for an approx. length of 45 linear feet. The ETWD R-6 Zone includes distribution piping and services and floats off the 275 million gallon R-6 Reservoir. Based on the analysis conducted for the proposed project, along with the pump station improvements, additional off-site improvements would be required to deliver water into the R-6 Zone. Off-site improvements would be required at three primary locations: 2nd Street, Grace Community Church, and Cherry Booster Station. improvements along 2nd Street would include installation of a 12-inch pipeline from the proposed pump station to Springwater for an approximate length of 650 feet. Other off-site improvements would include installation of flow meter, construction of interconnection, and check valve removal which would require minimal construction.

Contact Information

Name
Dennis Cafferty
Agency Name
El Toro Water District
Contact Types
Lead/Public Agency

Location

Counties
Orange
Cross Streets
El Toro Road, 2nd Street, Spring Water, Brookhaven, and Greenbank
Zip
92630
Total Acres
0.39
Parcel #
933-020-01
State Highways
I-5
Railways
Metrolink RR
Schools
Numerous
Waterways
Aliso Creek
Township
6S
Range
8W
Section
23
Base
SBBM
Other Location Info
Lake Forest

Notice of Determination

Approving Agency
City of Lake Forest
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No