San Elijo Land Outfall Replacement Project
5 Documents in Project
Summary
SCH Number
2016011018
Lead Agency
San Elijo Joint Powers Authority
Document Title
San Elijo Land Outfall Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2016
Present Land Use
Public/Semi Public, Ecological Reserve/Open Space/Park, Public Right-of-Way, Transportation Corridor
Document Description
The SEJPA proposes to replace the land outfall portion of the San Elijo Water Reclamation Facility (SEWRF) outfall system that extends between the SEWRF and the beach. The proposed alignment of the new land outfall would be slightly different from the existing outfall alignment in order to accommodate a trenchless construction method, horizontal direction drilling. The new pipeline would extend west approx. 80 linear feet from the existing outfall system within the existing SEWRF access road, under the access road, and across an existing flood control channel in an open trench. From there, it would turn southwestward for approx. 2,500 linear feet under Manchester Avenue, the Visitor Center parking lot, San Elijo Lagoon railroad tracks, Coast Hwy 101, and connect to the existing outfall located beneath the Cardiff State Beach. The State Lands Commission action is an approval of a 20-year General Lease - Public Agency Use through 2036.
Contact Information
Name
Ken Foster
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency
Phone
Location
Cities
Encinitas
Counties
San Diego
Cross Streets
Manchester Ave./ San Elijo Water Reclamation Facility/ San Elijo Lagoon Visitor Center
Zip
92007
State Highways
I-5
Railways
NCTD
Schools
Cardiff Elem.
Waterways
San Elijo Lagoon, Pacific Ocean
Township
13S
Range
4W
Section
26/27
Base
Enc
Other Location Info
Cardiff by the Sea
Notice of Determination
Approving Agency
CA State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.