Driveways for Cays Resort Dry Boat Storage Facility

Summary

SCH Number
2015128425
Public Agency
San Diego Unified Port District
Document Title
Driveways for Cays Resort Dry Boat Storage Facility
Document Type
NOE - Notice of Exemption
Received
Posted
12/29/2015
Document Description
the proposed project involves the construction of three new driveways to provide emergency access to the Cays Resort Dry Boat Storage Facility located at Grand Caribe Isle North along, and on both the east and west sides of, Caribe Cay Boulevard North in Coronado. Currently, there are no driveways located along the concrete sidewalks surrounding the east and west boat storage sites. To provide emergency access to the boat storage sites the project propose to construct two new driveways along the sidewalk surrounding the east site and one driveway along sidewalk surrounding the west site. Construction of the new driveways would include the following: - Cutting, removing and disposing of three approximately 30-foot-wide by 4-foot-long sections of existing concrete sidewalk; - Reshaping the existing subgrade under each of the concrete sidewalk sections; - Pouring concrete to create three new driveways that would be approximately 20 feet wide with 4-foot-wide driveway ramps on either side; - Placing 3/4 - inch gravel in the approximately 20-foot-long by 20-foot-2ide unpaved areas directly adjacent to driveways. Construction of the proposed project is anticipated to commence in early 2016 and take approximately one week to complete. It is anticipated that, at the height of the construction, the proposed project would generate an average of approximately four vehicle trips per day. Vehicle trips would be associated with delivery of materials and transport of construction workers. No roads would be blocked during construction. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of construction equipment, such as jack hammer and saw cutters. Therefore, no impacts would occur. Best management practices, including, but not limited to, fiber rolls, sandbags, and street sweeping and vacuuming, would be implemented during construction of the new driveways. Furthermore, the applicant would responsible for complying with all applicable federal, state, and local laws regulating construction demolition debris, hazards and hazardous materials, noise, and stormwater.

Contact Information

Name
Mayra Medel
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency

Location

Cities
Coronado
Counties
San Diego
Other Information
30 Caribe Cay Boulevard North, Coronado, CA 92118

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301 - Class 1
Reasons for Exemption
The project is determined to be Categorically Exempt pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15301 (Existing Facilities) and Section 3.a (8) of the District's Guidelines for compliance with CEQA because it is the construction of three new driveways along existing sidewalks that would involve no expansion of use beyond that previously existing. Section 3.a (8) of the District's CEQA Guidelines is as follows: - 3.a. Existing Facilities (SG § 15301) (Class 1): Includes operation, repair, maintenance, or minor alteration of existing public and private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that previously existing, including but not limited to: o Existing highways, streets, sidewalks, bicycle and pedestrian trails, and similar facilities, except where the activity will involve removal of a scenic resource including a stand of trees, a rock outcropping, or historic building.