San Gregorio Creek Habitat Enhancement Project at Driscoll Ranch (Streambed Alteration Agreement No. 1600-2017-0192-R3)
27 Documents in Project
Summary
SCH Number
2015122055
Lead Agency
California Department of Fish and Wildlife, Region 2
(CDFW)
Document Title
San Gregorio Creek Habitat Enhancement Project at Driscoll Ranch (Streambed Alteration Agreement No. 1600-2017-0192-R3)
Document Type
NOD - Notice of Determination
Received
Posted
9/5/2017
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0192-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, San Mateo County Resource Conservation District.
Instream coho salmon and steelhead trout habitat enhancement through large wood (LWD) installations will occur throughout 0.42 miles of mainstem San Gregorio Creek. Approx. 21 redwood logs will be sourced onsite from upslope, non-riparian trees. Additionally, up to 3 Douglas fir logs with rootwads and 2-4 boulders will be sourced from an onsite for use in the LWD structures. A total of 12-13 large wood structures are to installed along the project reach. all project large wood will be anchored with hardware as described in CDFW's CA Salmonid Stream Habitat Restoration Manual, 4th edition. Project will utilize the following techniques from the manual: log pinning with rebar (p. 179), stream bank anchors using rebar (p. 180), and bedrock and boulder anchors using threaded rebar (p. 181). All anchoring and positioning of LWD and boulders will be done with oversight from a qualified and licensed professional engineer.
Contact Information
Name
Jon Jankovitz
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
Mendocino
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No