Construction & Operation of Paradise MEadows Portable Water Storage Tank and Transmission Pipeline
4 Documents in Project
Summary
SCH Number
2015121078
Lead Agency
Eastern Municipal Water District
Document Title
Construction & Operation of Paradise MEadows Portable Water Storage Tank and Transmission Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2017
Present Land Use
Not applicable as Project will be within Public Streets Rights-of-way and RCFC Maintenance Road
Document Description
The SWRCB, as the responsible agency, will be issuing a water supply permit. The Eastern Municipal Water District will construct a 44 high 157 foot wide, 5 million gallon steel above ground water storage tank, a .39 million gallon detention basin for storm water and tank discharges, a v-ditch to convey runoff from the site to the housing storm drain system, a 20 foot wide 500 foot long access road, and a 24 inch transmission pipeline within the tank access road to connect the tank to the public right of way on Paradise Meadows Dr. This project will provide for the operations of the facilities.
Contact Information
Name
Steven Williams
Agency Name
SWRCB
Contact Types
Lead/Public Agency
Phone
Location
Cities
Menifee
Counties
Riverside
Cross Streets
Goetz Road and Newport Rd
Schools
Menifee
Township
6S
Range
3W
Section
6
Base
SBBM
Notice of Determination
Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes