Asphalt Plant No.1 Replacement and Modernization
2 Documents in Project
Summary
SCH Number
2015121036
Lead Agency
City of Los Angeles
Document Title
Asphalt Plant No.1 Replacement and Modernization
Document Type
NOD - Notice of Determination
Received
Posted
4/20/2016
Present Land Use
Industrial/M3-1/Heavy Industrial
Document Description
The City of Los Angeles is proposing to replace and modernize Asphalt Plant No. 1 located at 2484 E. Olympic Blvd., Council District 14. The proposed project would involve demolition of the existing Asphalt Plant No. 1, excavation and removal of contaminated soils, transportation of clean fill material onsite, construction of a modern plant, and construction of administration and maintenance building. It is anticipated that construction of the proposed project would take place over a period of approx. 25 months, from early August 2016 to early Sept. 2018. The proposed project is needed to replace the aged existing plant equipment and increase production capacity.
Contact Information
Name
Maria Martin
Agency Name
City of Los Angeles
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
E. Olympic Blvd./Sante Fe Ave.
Zip
90021
Total Acres
2.9
Parcel #
5168-002-900 & Por 5168-002-800
State Highways
I-10 Hwy 60
Railways
BNSF & Metrolink
Schools
Carmen Lomas Garza El
Waterways
Los Angeles River
Other Location Info
Boyle Heights
Notice of Determination
Approving Agency
City Council of the City of Los Angeles
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.