Lewan Trust Lot Line Adjustment and Conditional Use Permit; DRC2014-00146
2 Documents in Project
Summary
SCH Number
2015121031
Lead Agency
San Luis Obispo County
Document Title
Lewan Trust Lot Line Adjustment and Conditional Use Permit; DRC2014-00146
Document Type
NOD - Notice of Determination
Received
Posted
4/21/2016
Present Land Use
Vacant/Office land use designation
Document Description
A request by the Lewan Trust and PB Companies, LLC for: 1) a lot line adjustment, which would adjust two parcels of 4.098 acres each to two lots of 7.06 and 1.08 acres each and 2) a conditional use permit for the construction of a senior housing development including: a 70,000 sq. ft. assisted living building including 90 beds and a memory care facility; 70,000 sq. ft. independent living building including 67 studios; and ten 2,650 sq. ft. independent living bungalows (totaling 26,500 sq. ft.), including 40 units. THe project includes the construction of an internal access road and 203 paved parking spaces. Additional improvements include 4-foot and 5-foot wide concrete walkways throughout a retention basin. The request includes a modification to the height standards (35 feet) to allow heights of 39 and 44 feet (all heights are measured from average natural grade). The proposed project is within the Office Professional land use category and is located on the south side of Las Tablas Road approx. 200 feet west of Roya Ave., within the community of Templeton.
Contact Information
Name
Rex Steward
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Luis Obispo
Cross Streets
Las Tablas Rd. and Roya Ave.
Total Acres
8.2
Parcel #
040-289-014:015
State Highways
101
Schools
Templeton Unified School District
Waterways
Toad Creek
Other Location Info
Templeton
Notice of Determination
Approving Agency
San Luis Obispo County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.