Balfour Road Shoulder Widening
2 Documents in Project
Summary
SCH Number
2015112014
Lead Agency
Contra Costa County
Document Title
Balfour Road Shoulder Widening
Document Type
NOD - Notice of Determination
Received
Posted
12/18/2015
Present Land Use
Roads: Public/Semi-Public; Surrounding Parcels: Agriculture Preserve
Document Description
Contra Costa County Public Works Department (CCCPWD) plans to widen Balfour Road to bring the shoulders up to current design standard to provide a driver recovery area and a bike lane. The project segment is approximately three miles long and is a narrow, two-lane road that receives substantial traffic as it is used as a thoroughfare between Brentwood and Discovery Bay as well as a commuter route to SR 4. The project consists of widening the existing 18- to 20-ft pavement width to 36 ft wide (two 12-ft wide travel lanes with 6-ft wide paved shoulders/bike lanes and 2-ft wide shoulder backing on each side). The project does not increase the number of travel lanes and will therefore not increase the capacity of the roadway. The majority of the widening will occur along the south side of Balfour Rd. The segment between Byron Hwy and Bixler Rd will require adding 16 to 18 ft of asphalt pavement primarily along the south side of the rd. The segment between Sellers Ave and Byron Hwy will require adding 16 to 28 ft of asphalt pavement along the south side. Left turn lane pockets will be added on the east and west legs of Balfour Rd at Byron Hwy and a left turn pocket lane will be added on the west leg of Balfour Rd at Bixler Rd. A drainage system consisting of an open roadside ditch and underground pipe will be installed to collect and convey roadside runoff. The existing County rd ROW varies from 40 to 100 ft. CCCPWD will need to acquire strips of land in those areas where the existing ROW cannot accommodate the shoulder widening, and utility relocations. The strips of land to be acquired vary between 5 to 15 ft along the north side of Balfour Rd from various parcels and between 5 to 44 ft from various parcels along the south side of the road. The ECCID holds easements and fee titles within some of the parcels where they have their canal and underground pipe facilities. Residential landscape trees and fences located within the proposed ROW will need to be removed. Temporary construction easements will also be needed for construction staging areas. Construction of the project is anticipated to start in 2017 and take approximately six months to complete.
Contact Information
Name
Claudia Gemberling
Agency Name
Contra Costa County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Brentwood
Counties
Contra Costa
Cross Streets
Sellers Avenue, Byron Highway, Bixler Road
Zip
94514
Total Acres
28
Parcel #
Various
State Highways
4
Schools
Edna Hill Midlle, Liberty
Waterways
East Contra Costa District Irrigation Canal
Township
1N
Range
3E
Section
15-17
Base
Mt.Diabl
Other Location Info
Discovery Bay
Notice of Determination
Approving Agency
Contra Costa County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.