Napa Sanitation District Solar Project
2 Documents in Project
Summary
SCH Number
2015102052
Lead Agency
Napa Sanitation District
Document Title
Napa Sanitation District Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
12/8/2015
Present Land Use
Agricultural Watershed / Airport Compatibility Zoning Designation and Public-Institutional General Plan Designation
Document Description
The purpose of the proposed project is to generate electricity for use by the District at the Soscol Water Recycling Facility. The project consists of the construction, operation and ultimate decommissioning of a 1 megawatt solar generating facility. The project site is located in unincorporated Napa County, approximately 350 ft south of Hwy 12. The project would be constructed on a undeveloped parcel owned by Napa Sanitation District. The project consists of the construction, operation and ultimate decommissioning of a 1 megawatt solar generating facility, including solar panels, inverters, and associated infrastructure, including construction of new connections to the existing transmission system, which currently comprises an existing 40 ft tall transmission pole and overhead line.
Contact Information
Name
Robin Gamble Holley
Agency Name
Napa Sanitation District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Napa
Cross Streets
Soscol Ferry Road
Zip
94558
Total Acres
2
Parcel #
046400015000; 046400016000
State Highways
Hwy 12, 29, 121, 221
Airports
Napa County Airport
Waterways
Napa River
Notice of Determination
Approving Agency
Napa Sanitation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.