Soquel Forest Fire Station Replacement

2 Documents in Project

Summary

SCH Number
2015102046
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Soquel Forest Fire Station Replacement
Document Type
NOD - Notice of Determination
Received
Posted
12/1/2015
Present Land Use
Forest Fire Station, Soquel Demonstration State Forest Office and accessory structures/Rural Agricultural/Public Facility
Document Description
The project includes the demolition of all existing buildings and appurtenances onsite and construction of a new facility consisting of a one-engine, four-bedroom fire station combined with a mess hall and apparatus building (6,184 sf). Additional project components include a new office-education center for the Soquel Demonstration State Forest (3,000 sf), a generator pump storage building (648 sf), masonry trash enclosure (+/-150 sf), fuel vaults and tanks, hose wash rack (52 ft by 5 ft), flag pole, radio tower (35 ft) and two above ground storage tanks (eight feet high with approximate diameters of 26 ft and 15 ft). In addition to the improvements described above, the project would include additional components consisting of site grading, paving for road and parking areas, installation of retaining walls, curbs, gutters and sidewalks, storage and distribution systems, wastewater disposal systems, drainage systems and erosion control measures.

Contact Information

Name
Christina Snow
Agency Name
Cal Fire
Contact Types
Lead/Public Agency

Location

Counties
Santa Cruz
Cross Streets
Olive Springs Road
Zip
95073
Total Acres
2.6
Parcel #
103-21-116
Schools
Mountain ES
Waterways
Soquel Creek
Township
10S
Range
1W
Section
23
Base
MDB&M
Other Location Info
Soquel

Notice of Determination

Approving Agency
CalFire
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print