Green Enso Yama Water Diversion and Crossing Project, Enso Yama, LLC (Lake or Streambed Alteration Agreement No. 1600-2020-0369-R1)

549 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Green Enso Yama Water Diversion and Crossing Project, Enso Yama, LLC (Lake or Streambed Alteration Agreement No. 1600-2020-0369-R1)
Document Type
NOD - Notice of Determination
Received
Posted
12/29/2020
Document Description
The project is limited to 3 encroachments. One encroachment is for water diversion from an unpermitted well located on unnamed tributaries to Little Burr Creek. Water is diverted for domestic use and commercial irrigation. Work for the water diversion will include use, and maintenance of the water diversion infrastructure. The two other proposed encroachments are to upgrade failing and undersized stream crossings. Work for these encroachments will include excavation, removal of the failing crossings, replacement with new properly sized crossings, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. Supplemental information provided in the Notification indicates that Turtle Pond Farms includes adjacent APN 210-061-006. This Agreement does not include any assessment of 210-061-006 nor does it authorize any water diversion or permit any stream crossings on that parcel. The diversion disclosed in joint WRPP WDID 1B161324CHUM for adjacent APN 210-061-006 requires separate notification.

Contact Information

Name
Christine Hahn Vertical
Agency Name
California Department of Fish & Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Summer Green
Contact Types
Project Applicant

Location

Cities
Bridgeville
Counties
Humboldt
Regions
Northern California
Cross Streets
approximately 3.9 miles South East of the town of Bridgeville, County of Humboldt
Zip
95526
Parcel #
210-061-008
State Highways
Highway 101
Waterways
Eel River Watershed

Notice of Determination

Approving Agency
Cheri Sanville-CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print