Owen Stream Crossing and Pond Overspill Project (Lake or Streambed Alteration Agreement No. EPIMSHUM-09996-R1)

549 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Owen Stream Crossing and Pond Overspill Project (Lake or Streambed Alteration Agreement No. EPIMSHUM-09996-R1)
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2020
Document Description
The project is limited to two encroachments. The first encroachment shall reconstruct and upgrade the overspill of an onstream pond. In its current configuration the overspill misdirects streamflow from its natural channel; the new design shall convey all downstream flow to the natural channel. Work for this encroachment will include excavation, installation of a spillway sized to convey the 100-year flow, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. The second encroachment shall improve an informal dirt-fill stream-crossing that impedes and impounds stream flow. Work for this encroachment will include excavation, installation of a culvert sized to convey the 100-year flow, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
Cheri Sanville
Agency Name
CDFW
Contact Types
Lead/Public Agency

Name
Agency Name
Adam Owen
Contact Types
Project Applicant

Location

Cities
Garberville
Counties
Humboldt
Regions
Northern California
Other Location Info
The project is located within the Chamise Creek watershed, approximately twelve miles east-southeast of the town of Garberville, County of Humboldt, State of California. The project is located in Section 1, T5S, R5E, Humboldt Base and Meridian, in the Jewett Rock U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 218-121-005.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No