Alban Stream Crossings Project (Streambed Alteration Agreement No. 1600-2018-0282-R1)

549 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Alban Stream Crossings Project (Streambed Alteration Agreement No. 1600-2018-0282-R1)
Document Type
NOD - Notice of Determination
Received
Posted
9/29/2020
Document Description
The project is limited to two encroachments (Table 1) to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. Water for all uses is from Garberville Sanitary District.

Contact Information

Name
Cheri Sanville
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Other Location Info
The project is located within the South Fork Eel River watershed, approximately one-mile northeast of the town of Garberville, County of Humboldt, State of California. The project is located in Section 18, T04, R04, Humboldt Base and Meridian; in the Garberville U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 223-191-002; latitude/longitude: 40.1072, -123.7794 at a stream crossing.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print