Cipriano Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2019-0091-R1)
549 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Cipriano Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2019-0091-R1)
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2020
Document Description
The project is limited to five encroachments. One encroachment is for water diversion from unnamed tributaries to Buck Mountain Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. One encroachment is to Notify for an class II on-stream pond constructed in 1987 without an Agreement. Water is not diverted from the pond. Three other proposed encroachments are to decommission failing and undersized culverts. Work for these encroachments will include excavation, removal of the failing culverts and restoring the stream channels.
Contact Information
Name
Greg O’Connell
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency
Phone
Location
Counties
Humboldt
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 3 miles E/NE of the town of Garberville, County of Humboldt, State of California. The project is located in Section 16, T04S, R04E, Humboldt Base and Meridian; in the Harris U.S. Geological Survey 7.5-minute quadrangle; Humboldt County Assessor’s Parcel Number 223-124-006; latitude 40.1103 N and longitude 123.7374 W at the point of diversion.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No