Sherr Water Diversion Project (Lake or Streambed Alteration Agreement No. 1600-2018-0198-R1)

549 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Sherr Water Diversion Project (Lake or Streambed Alteration Agreement No. 1600-2018-0198-R1)
Document Type
NOD - Notice of Determination
Received
Posted
7/7/2020
Document Description
The project is limited to two encroachments. Both encroachments are for water diversion from unnamed tributaries to Chamise Creek. Water is diverted for domestic use and irrigation. Work for the water diversions will include use and maintenance of water diversion infrastructures. Additionally, as mitigation for prior impacts associated with spillway of the pond (crossing 1), the Permittee has agreed to provide the Humboldt County Public Works Department materials (including culvert and rock) for the County to replace a County-maintained culvert located at 40.045869, -123.576194

Contact Information

Name
Greg O’Connell
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 12 miles east /southeast of the town of Garberville, County of Humboldt, State of California. The project is located in Section 11, T05S, R05E, Humboldt Base and Meridian; in the Jewett Rock U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 218-031-008; latitude 40.0460 N and longitude 123.5777 W at the point of diversions.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print