Hansen and Borst Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2020-0081-R1)
549 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Hansen and Borst Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2020-0081-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2020
Document Description
The project is limited to eight encroachments. Two encroachments are for water diversion from unnamed tributaries to the South Fork Salmon Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. The six other proposed encroachments are to upgrade culverts, install two new culverts, rock armor inlets and outlets of culverts, and realign a diverted stream. Work for these encroachments will include excavation, removal of existing culverts, installation or replacement with new culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.
Contact Information
Name
David Manthorne
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Humboldt County
Contact Types
Project Applicant
Location
Counties
Humboldt
Other Location Info
The project to be completed is located within the Salmon Creek and South Fork Eel River watersheds, approximately 5.5 miles west/southwest of the town of Philipsville, County of Humboldt, State of California. The project is located in Section 19, T3S, R3E, Humboldt Base and Meridian; in the Ettersburg U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Numbers 219-081-001 and 219-081-003; latitude 40.1853 N and longitude 123.8857 W.
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No