Gochev Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0067-R1)

549 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Gochev Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0067-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2020
Document Description
The project is limited to seven encroachments. One encroachment is for water diversion from unnamed tributaries to Dairy Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. Four other proposed encroachments are to upgrade failing or undersized stream crossings. Work for these encroachments will include excavation, removal of the failing crossings, replacement with new properly sized crossings, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. The two remaining encroachments are to remove fill material in stream areas and restore the stream channels.

Contact Information

Name
Steven Lazar
Agency Name
Humboldt County Dept. of Planning and Building
Contact Types
Lead/Public Agency

Location

Cities
Dinsmore
Counties
Humboldt
Parcel #
210-141-016
Waterways
Eel River watershed, Swayback Ridge region
Township
01N
Range
05E
Section
35
Other Location Info
Dinsmore U.S. Geological Survey 7.5-minute quadrangle

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print