Studebaker Water Diversion and Stream Crossings Project (Streambed Alteration Agreement No. 1600-2019-0341-R1)
549 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Studebaker Water Diversion and Stream Crossings Project (Streambed Alteration Agreement No. 1600-2019-0341-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2020
Document Description
The project is limited to three encroachments (Table 1). Three encroachments are for water diversion from springs that are tributary Redwood Creek. Water is diverted for domestic use. Work for the water diversion will include use, maintenance and removal of the water diversion infrastructure. Two crossings adjacent to POD-2 & POD-3 also require work to correct flow and erosion issues by upgrading the crossings with a culvert and a rocked ford. Work for these encroachments will include excavation, removal of the failing crossings, replacement with new properly sized crossings, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. (See NOD for full details)
Contact Information
Name
Steven Lazar
Agency Name
Humboldt County Dept. of Planning and Building
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Cities
Redway
Counties
Humboldt
Parcel #
220-272-030
Waterways
Redwood Creek watershed
Township
04S
Range
03E
Section
7
Base
HBM
Other Location Info
Briceland U.S. Geological Survey 7.5-minute quadrangle
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No