Vogel Stream Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2019-0437-R1)

549 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Vogel Stream Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2019-0437-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2020
Document Description
The project is limited to one encroachment. The encroachment is for stream restoration at a failing on-stream reservoir. During the site inspection, CDFW observed an on-stream reservoir previously used for cannabis irrigation that showed signs of a large recent earth movement, including an approximately 100-foot wide earth slump that dropped approximately three feet in elevation at and below the reservoir berm. The Permittee shall submit a stream restoration plan by July 31, 2020 for CDFW review and approval. The stream restoration plan shall include an evaluation prepared by a CA licensed geologist that analyzes slope stability and makes recommendations to stabilize the area and minimize the risk of further instability, erosion, and threats to water quality and aquatic life. CDFW anticipates, at a minimum, that the work will include modification to the reservoir berm to eliminate water impoundment and additional site-specific slope stability and erosion control measures. Work for this encroachment will include excavation, erosion control, rock armoring as necessary to minimize erosion and revegetation with native plants.

Contact Information

Name
Steven Lazar
Agency Name
Humboldt County Dept. of Planning and Building
Contact Types
Lead/Public Agency

Location

Cities
Benbow
Counties
Humboldt
Parcel #
033-130-003
Waterways
Eel River watershed
Township
05S
Range
04E
Section
05
Base
HBM
Other Location Info
Garberville U.S. Geological Survey 7.5-minute quadrangle

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print