Patton Water Diversion, Pond, and Stream Crossings Project (Lake or Streambed Alteration Agreement No. EPIMS-08831-R1)

549 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Patton Water Diversion, Pond, and Stream Crossings Project (Lake or Streambed Alteration Agreement No. EPIMS-08831-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/1/2020
Document Description
The project is limited to five encroachments. One encroachment is for water diversion from an unnamed tributary to the Eel River. Water is diverted for irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. Three other proposed encroachments are to upgrade or permit culverts at road/stream crossings. The final encroachment will permit reconstruction of a pond outlet. Reconstruction will include replacement of the spillway and compaction of the fill berm. Work for these encroachments will include excavation, removal of the existing culvert, replacement with new properly sized culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
David Manthorne
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Parcel #
217-262-004 and 217-265-001
Township
2S
Range
5E
Section
20
Base
HB&M
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 0.5 miles southwest of the town of Blocksburg, County of Humboldt, State of California.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No