Curran Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2019-0624-R1)

549 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Curran Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2019-0624-R1)
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2020
Document Description
The project is limited to one encroachment. The encroachment is to upgrade a filled stream crossing. Work for this encroachment will include excavation, removal of fill material, replacement with new properly sized crossings, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
Cheri Sanville
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Humboldt County
Contact Types
Project Applicant

Location

Counties
Humboldt
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 7.1 miles E/SE of the town of Garberville, County of Humboldt, State of California. The project is located in Section 30, T04S, R05E, Humboldt Base and Meridian; in the Harris U.S. Geological Survey 7.5-minute quadrangle; associated with Assessor’s Parcel Numbers 216-081-008 and 216-083-006; latitude 40.079339 N and longitude 123.662267W at the stream crossing.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print