Wansick Water Diversion and Stream Crossings Project 3 Encroachments 1600-2019-0909-R1

549 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Wansick Water Diversion and Stream Crossings Project 3 Encroachments 1600-2019-0909-R1
Document Type
NOD - Notice of Determination
Received
Posted
3/6/2020
Document Description
This Agreement relies on the Notification materials a desk review without a CDFW site inspection. The project is limited to three encroachments. One encroachment is for water diversion from unnamed tributary to China Creek. Water is diverted for domestic use only. Work for the water diversion will include use and maintenance of the water diversion infrastructure. The two other proposed encroachments are to upgrade a failing and undersized stream crossing and to place appropriately sized rock at inlets and outlets for the second stream crossing. Work for these encroachments will include excavation, removal of the failing crossings, replacement with new properly sized crossings, backfilling and compaction of fill , and rock armoring as necessary to minimize erosion.

Contact Information

Name
Christine Hahn Vertical
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Humboldt County
Contact Types
Project Applicant

Location

Counties
Humboldt
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 6.4 miles SW of the town of Redway, County of Humboldt, State of California. The project is located in Section 14, T04S, R02E, Humboldt Base and Meridian; in the Briceland U.S. Geological Survey 7.5-minute quadrangle; Assessor's Parcel Number 220- 052-007 latitude 40.1059 N and longitude -123.9351 Wat the first point of diversion (POD).

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No