Scott Water Diversion and Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2017-0709-R1)

549 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Scott Water Diversion and Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2017-0709-R1)
Document Type
NOD - Notice of Determination
Received
Posted
10/31/2018
Present Land Use
The project applies across all land use designations
Document Description
The project consists of 5 encroachments. One encroachment is a water diversion from a Class III watercourse. Water is collected in a small spring box and transferred through a 3/4 inch poly pipe to storage for domestic household use. A second encroachment is water idversion from a Class II watercourse. Water is collected in a small spring box and transferred through a 3/4 inch poly pipe to storage for domestic household use. A third encroachment is to rpelace an existing 18 inch culvert with a 24 inch culvert. A fourth encroachment is to install a flared inlet on an existing 18 inch culvert. A fith encroachment is to install a rip rap on the outlet fill of an existing 48 inch culvert.

Contact Information

Name
Angela Liebenberg
Agency Name
CDFW, Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Parcel #
219-071-003
Waterways
Eel River
Township
3S
Range
3E
Section
19
Base
HB&M
Other Location Info
Myers Flat
Other Information
town of Fortuna

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print