Karen Wise & Verizon Wireless Conditional Use Permit DRC2014-00100

2 Documents in Project

Summary

SCH Number
2015091021
Lead Agency
San Luis Obispo County
Document Title
Karen Wise & Verizon Wireless Conditional Use Permit DRC2014-00100
Document Type
NOD - Notice of Determination
Received
Posted
12/3/2015
Present Land Use
Residential Rural
Document Description
Request by Karen Wise & Verizon Wireless for a Conditional Use Permit to allow the construction and operation of an unmanned wireless communication facility, consisting of one new 75' tall artificial eucalyptus tree ("mono-eucalyptus") supporting twelve 6' tall panel antennas, twelve new Remote Radio Units (RRUs), and four Raycaps (two located in the equipment area). The PH number antennas would be located in two sectors of six panel antennas each, one sector mounted at a height of 59' and the other at height of 67' (measured to center of antennas) on the proposed mono-eucalyptus. The project also includes installation of two GPS antennas, an electric meter located near the base of the mono-eucalyptus, and new equipment cabinets and a 132 gallon diesel standby generator located on concrete slabs. All proposed above ground improvements will be located within a 24' x 24' lease area, surrounded by an 8' high wood fence enclosure. The project involves approximately 350' linear feet of trenching for a new power/telco utility route, with a total project site disturbance of approximately 1,050 sf of a 5-acre parcel.

Contact Information

Name
Cody Scheel
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency

Location

Cities
Arroyo Grande
Counties
San Luis Obispo
Cross Streets
South Halcyon Road & El Campo Road
Zip
93420
Total Acres
5
Parcel #
075-232-054
State Highways
Hwy 1
Railways
SPRR
Schools
Lucia Mar USD
Waterways
Los Berros Creek & unnamed tributary to Black Lake

Notice of Determination

Approving Agency
San Luis Obispo County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes