Document Description
SWRCB as the lead agency will be issuing a water supply permit. The California Water Service Company proposes to increase storage capacity for the water system by installing a 3.86-million-gallong tank along with a 1-MG tank, designated phase 1 and phase 2, respectively. The MPS Station 27 Beresford Tanks Project would double storage capacity at existing Mid-Peninsula District station 27 from 5 MG to approximately 10MG. Phase 1 includes the installation of the new 3.86-MG concrete storage tank (161 ft in diameter and 35 ft in height), and also associated piping and accessories for connecting to the existing distribution system. Phase 2 will include installation of the 1-MG tank (80 ft in diameter and 32 ft in ht) and associated piping and accessories to connect to the existing distribution system.

Contact Information

Name
Eric Lacy
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
San Mateo
Counties
San Mateo
Cross Streets
In the vicinity of Highway 92 and Highway 82
Zip
94403
State Highways
Hwy 82, 92, 101, 280
Railways
Caltrain Hayward Park
Schools
College of San Mateo

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print