State Route 108 Riverbank Slope Protection Project (Stream bed Alteration Agreement No. 1600-2018-0291-R4)

4 Documents in Project

Summary

SCH Number
2015072042
Lead Agency
California Department of Transportation, District 10
Document Title
State Route 108 Riverbank Slope Protection Project (Stream bed Alteration Agreement No. 1600-2018-0291-R4)
Document Type
NOD - Notice of Determination
Received
Posted
5/23/2019
Document Description
The Project involves the demolition and replacement of a 468-foot segment of State Route 108 involving the demolition and replacement of the westbound lane and its associated appurtenant stormwater drainage system. The replacement segment of the westbound lane will be constructed over new concrete piles and equipped with new over-side drainage pipes.

Contact Information

Name
Javier Mendez
Agency Name
Department of Fish and Wildlife Central Region
Contact Types
Lead/Public Agency

Location

Cities
Riverbank
Counties
Stanislaus
Township
02S
Range
09E
Section
25
Base
MDB&M
Other Location Info
The Project will occur on a 468-foot segment of State Route 108 in the city of Riverbank in Stanislaus County, between Post Mile 33.1 and Post Mile 33.4, which exists on a high bank above and outside the south bank of the Stanislaus River at the north edge of town and can be located on the Riverbank, California 7.5 minute quadrangle United States Geological Survey topographic map.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print