Kiefer Landfill Stormwater Improvements

2 Documents in Project

Summary

SCH Number
2015072030
Lead Agency
Sacramento County
Document Title
Kiefer Landfill Stormwater Improvements
Document Type
NOD - Notice of Determination
Received
Posted
5/19/2016
Present Land Use
Public/Quasi Public/AG 80 (f)
Document Description
The project consists of the construction of new stormwater improvements at the Kiefer Landfill. Project construction will involve the placement of a 24-inch diameter corrugated polyethylene (CPE) pipe with a minimum grade of -0.5 percent. The gravity flow line would extend southeast from the existing manhole at the public entrance along Kiefer Boulevard for approximately 1,200 feet to an existing manhole upstream of the concrete lined stormwater channel discharging to Sedimentation Basin A. The alignment of the pipe will be adjacent to Kiefer Boulevard and after the contractor entrance will veer eastward around the native tree plantings. One new stormdrain inlet will be installed near the main entrance. Three new manholes will be constructed, one on each side of the contractor entrance, and one at the terminus of the existing stormwater pipe north of the native tree plantings. Construction methods will use a box trench design to achieve proper pipe depth when below grade. The limits of work will be limited to a 14-foot wide area along the alignment adjacent to Kiefer Boulevard and a 30-foot wide area along the overland alignment. An unnecessary drainage inlet and an asphalt ramp will be removed and a 110-foot section of chain link fence will be removed and replaced.

Contact Information

Name
Catherine Hack
Agency Name
Sacramento County
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
Kiefer Blvd / Grantline Rd
Zip
95683
Total Acres
.7
Parcel #
126-0090-021
State Highways
Hwy 16
Waterways
Deer Creek
Township
8N
Range
7E
Section
35
Base
MDB&M
Other Location Info
Sloughhouse

Notice of Determination

Approving Agency
County of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No