Gold Hill Road Over Auburn Ravine Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2015062005
Lead Agency
Placer County
Document Title
Gold Hill Road Over Auburn Ravine Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/7/2015
Present Land Use
Placer County Zone Designation: Farming - Building Site with 4.6 acre minimum size (F-B X 4.6 AC. Minimum.)
Document Description
The proposed improvements include the replacement of the existing bridge. The proposed bridge will be approximately 92 feet long and will be supported on seat type abutments. The abutments will be located behind the existing abutments and will be placed outside the limits of the Ordinary High Water Mark. Excavation depth at the abutments will be up to 20 feet, measured from the existing roadway surface. The Gold Hill Road bridge profile will be raised to provide hydraulic clearance required for the design hydrologic event. The roadway alignment will remain at relatively the same location as the existing roadway alignment. The roadway approaches would be widened from 20 feet to 32 feet wide and raised by a maximum of approximately eight feet to conform to the replacement structure.

Contact Information

Name
Lori Perron
Agency Name
Placer County
Contact Types
Lead/Public Agency

Location

Cities
Lincoln
Counties
Placer
Cross Streets
Gold Hill Road and Virginiatown Road
Zip
95658
Total Acres
20
State Highways
Hwy 193
Waterways
Auburn Ravine
Township
12N
Range
7E
Section
10

Notice of Determination

Approving Agency
Placer County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print