Knights Landing Outfall Gates Project
7 Documents in Project
Summary
SCH Number
2015062004
Lead Agency
Reclamation District No. 108
Document Title
Knights Landing Outfall Gates Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Water
Document Description
The proposed project consists of constructing a positive fish barrier on the downstream side of the Knights Landing Outfall Gates (KLOG) and repairing an erosion site on the right bank of the Colusa Basin Drain (CBD). The fish barrier would prevent adult salmonids from passing upstream through the KLOG, where they are subsequently lost from production. The barrier would consist of concrete wingwalls and metal picket weirs that would allow flows from the CBD to continue downstream. Erosion site repair would require placement of riprap along 100 linear feet of the right bank of the Colusa Basin Drain, which is a Sacramento River Flood Control Project levee.
Contact Information
Name
Lewis Bair
Agency Name
Reclamation District No. 108
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Yolo
Cross Streets
Road 108 and SR 45 (nearest cross streets)
Zip
95776
Total Acres
5.89
State Highways
SR-45, Hwy 113
Schools
Science & Tech Acad.
Waterways
Colusa Basin Drain, Sacramento River
Township
11N
Range
2E
Section
15
Other Location Info
Knights Landing
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), Central Valley Flood Protection Board, Delta Protection Commission, Delta Stewardship Council, Department of Water Resources, Resources Agency, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Other (Fish barrier and erosion repair)
Local Actions
Fish barrier
Project Issues
Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Vegetation, Wetland/Riparian
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.