Lendrum Court Removal Action Work Plan, Presidio of San Francisco
2 Documents in Project
Summary
SCH Number
2015062003
Lead Agency
Department of Toxic Substances Control
Document Title
Lendrum Court Removal Action Work Plan, Presidio of San Francisco
Document Type
NOD - Notice of Determination
Received
Posted
8/6/2015
Present Land Use
Multi-unit Residential Housing; Contemplative Retreat
Document Description
DTSC has approved the Lendrum Court Project (Project) Final Removal Action Work Plan, dated July 30, 2015 (RAWP) pursuant to Health and Safety Code, Chapter 6.8 as submitted on July 31, 2015, by TRC Solutions, Inc. on behalf of the Presidio Trust. The proposed project would consolidate, remove and cap incinerator debris and ash, and soil contaminated by chemicals of concert (COCs). Post-remediation site restoration would occur immediately after remedial construction in 2015 and 2016.
The proposed project would combine multiple technologies for removal/consolidation of Army-era debris and incinerator ash from the shallow sub-surface, construction of a site cover, and implementation of land use controls (LUCs). Contaminated material that cannot be consolidated within the capped area limits would be excavated, characterized, and transported for off-site disposal at a licensed landfill facility. The volume of soil that would be removed is estimated at approximately 1,500 cy and includes the organic rich upper 4 to 6 inches of soil.
Contact Information
Name
George Chow
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Francisco
Counties
San Francisco
Cross Streets
Lincoln Blvd
Zip
94129
Total Acres
4.5
Parcel #
1300001
State Highways
SR 1
Railways
No
Airports
No
Schools
University of San Francisco, Presidio
Waterways
Golden Gate
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.