Banning Master Drainage Plan Line H, Stage 1 Project

3 Documents in Project

Summary

SCH Number
2015061074
Lead Agency
Riverside County Flood Control and Water Conservation
Document Title
Banning Master Drainage Plan Line H, Stage 1 Project
Document Type
NOD - Notice of Determination
Received
Posted
12/21/2015
Present Land Use
Public facilities, industrial, Rural residential, very low density residential
Document Description
The District proposes to construct, operate and maintain an underground storm drain system comprised of approximately 200 ft of 7-ft wide by 4-ft high reinforced concrete box and approximately 3,700 ft of reinforced concrete pipe ranging in size from 48-in to 72-in diameter. The underground storm drain would be constructed along South Hathaway St, beginning at approximately East Barbour St and extending approximately 0.5 mile south to Wesley St and then continuing east along Wesley St for approximately 0.25 mile to a proposed outlet at the Smith Creek Channel. Existing utilities within Wesley and South Hathaway St may need to be relocated during construction. Associated appurtenant structures to be constructed within and adjacent to Hathaway St and Wesley St right-of-ways include inlets, and catch basins. A wing wall outlet structure and riprap apron would be constructed at the storm drain outlet proposed at Smith Creek. This wing wall outlet structure would require removal and reconstruction of existing concrete slope paving at Smith Creek.

Contact Information

Name
Mike Wong
Agency Name
Riverside County Flood Control and Water Conservation
Contact Types
Lead/Public Agency

Location

Cities
Banning
Counties
Riverside
Cross Streets
Hargrave Street and Barbour Street
Zip
92220
Parcel #
532180013, 5322180052, 531180025
State Highways
Hwy 10, 243
Railways
UPRR
Airports
Banning Municipal
Schools
Banning HS
Waterways
Smith Creek
Township
3S
Range
1W
Section
10/11
Base
SBB&M

Notice of Determination

Approving Agency
Riverside County Flood Control and Water Conservation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No