Colton Ave/6th St & Nevada St/Lugonia Ave Non-Potable Pipeline Project 1M-NP-M15-0301
3 Documents in Project
Summary
SCH Number
2015061030
Lead Agency
City of Redlands
Document Title
Colton Ave/6th St & Nevada St/Lugonia Ave Non-Potable Pipeline Project 1M-NP-M15-0301
Document Type
NOD - Notice of Determination
Received
Posted
5/12/2016
Document Description
The City of Redlands Municipal Utilities and Engineering Department is proposing to install a total 17,090 lineal feet in eight inch and twelve inch non-potable water piping segments. The non-potable pipeline will be installed within the public right-of-way at approximately four feet below the existing pavement surface. Various appurtenances including valves, services, blow-offs and combination air valves will be installed along the alignments. The pipeline will be completed within two phases, with the "Colton Avenue & 6th Street Non-Potable Pipeline Project" as identified as Phase 1, and the "Nevada Street 7 Lugonia Avenue Non-Potable Pipeline Project" as identified as Phase 2.
Contact Information
Name
Emily Elliott
Agency Name
City of Redlands
Contact Types
Lead/Public Agency
Phone
Location
Cities
Redlands
Counties
San Bernardino
Zip
92374
State Highways
I-210 & 10
Railways
San Ber. Asso. of Gov.
Airports
San Bernardino & Redlands
Schools
Redlands Unified
Waterways
Santa Ana River, Zanja
Notice of Determination
Approving Agency
City of Redlands
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.