Hauser Bridge Road Bridge over the South Fork Gualala River Replacement Project
3 Documents in Project
Summary
SCH Number
2015052058
Lead Agency
Sonoma County
Document Title
Hauser Bridge Road Bridge over the South Fork Gualala River Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/12/2015
Present Land Use
public road right-of-way - adjacent land use designation of Resources an Rural Development
Document Description
The Department of Transportation and Public Works proposes to replace the existing bridge on Hauser Bridge Road over the South Fork of the Gualala River, in the northwest portion of the County. The existing bridge would be replaced with a two-lane, 29-foot wide, and 165-foot long two-span asymmetric steel tied arch bridge. The new bridge would be located parallel to and westerly of the existing bridge. The existing bridge would remain in service until the new bridge is complete, then removed. Building the bridge on a new alignment requires construction of new approaches on the north and south sides of the replacement bridge. For the south approach to the new bridge, a small knoll would be cleared of vegetation and excavated. The north approach would be built on fill.
Contact Information
Name
Chris Seppeler
Agency Name
Sonoma County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Sonoma
Cross Streets
Seaview Road Kruse Ranch Road
Railways
No
Airports
No
Waterways
South Fork Gualala River
Other Location Info
Sea Ranch
Notice of Determination
Approving Agency
Sonoma County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A