City of Pico Rivera Low Volume Street Sweeper Transfer Facility
2 Documents in Project
Summary
SCH Number
2015051071
Lead Agency
City of Pico Rivera
Document Title
City of Pico Rivera Low Volume Street Sweeper Transfer Facility
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2015
Present Land Use
City Operations Yard
Z: Public Facilities
GP: Public Facilities
Document Description
The City of Pico Rivera is seeking to construct a street sweeper transfer facility at the existing City Operations Yard at 9633 Beverly Road. The project consists of the development of a 26-foot-long by 15-foot-wide concrete slab with three 5-foot-high perimeter walls to be developed along the northeastern perimeter of the existing Operations Yard. An 8-inch sewer line would be constructed for leachate and wastewater collection. The new sewer line would connect to the existing car wash clarifier located in the center of the Operations Yard, approximately 320 feet from the street sweeper transfer facility.
Contact Information
Name
Julia Gonzalez
Agency Name
City of Pico Rivera
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Pico Rivera
Counties
Los Angeles
Cross Streets
Beverly Road / San Gabriel River Parkway
Zip
90660
Total Acres
2.5
Parcel #
8122-011-900 and -901
State Highways
I-605, SR 19
Railways
UPRR
Schools
North Park MS
Waterways
San Gabriel River
Notice of Determination
Approving Agency
City of Pico Rivera
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No