Corrective Action Remedy for Former Industrial Light Metals Facility

2 Documents in Project

Summary

SCH Number
2015041072
Lead Agency
Department of Toxic Substances Control
Document Title
Corrective Action Remedy for Former Industrial Light Metals Facility
Document Type
NOD - Notice of Determination
Received
Posted
7/15/2015
Present Land Use
Currently devleoped with warehouse/coom'l & office bldgs; Z: M-3 (Heavy Industrial); GPD: Heavy Industrial
Document Description
The proposed project is to clean up groundwater at the ILM site, located in the City of Los Angeles (adjacent to the City of Torrance) in Los Angeles County, California. The proposed cleanup includes active treatment on-site of areas where concentrated contaminant mass is present in unsaturated zone soils and the water table aquifer present beneath the site. Active treatment includes installing remediation wells, constructing and permitting vapor and/or groundwater treatment systems, and associated pumps, piping, and other infrastructure. Active treatment would continue until performance-based goals are achieved. Residual groundwater impacts would then be addressed by Monitored Natural Attenuation.

Contact Information

Name
Vu Nguyen
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of, Torrance, Torrance
Counties
Los Angeles
Cross Streets
South Western Avenue and W 190th Street
Zip
90501
Total Acres
67.5
Parcel #
735-100-3013
State Highways
I-405 and 110
Schools
186th St ES, Gardena HS

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print