Pit 3, 4, 5 Hydroelectric Project; Pit 3 Dam Rubber Bladder Gates Replacement Project

Summary

SCH Number
2015038001
Public Agency
State Water Resources Control Board
Document Title
Pit 3, 4, 5 Hydroelectric Project; Pit 3 Dam Rubber Bladder Gates Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
3/4/2015
Document Description
PG&E is proposing to test the three newly installed spillway rubber bladder control gates at Pit 3 Dam at the maximum normal water level for Lake Britton. Testing is necessary to ensure the safety and reliability of the control gates operation prior to the non-spill period, which begins on April 21, 2015.

Contact Information

Name
Oscar Biondi
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Counties
Shasta

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301,15302, Class 1, 2
Reasons for Exemption
Existing Facilities. Replacement or Reconstruction of Existing Facilities.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print