Final Initial Study/Mitigated Negative Declaration for the City of Folsom's Pump Station No. 1 Storage Basin Reuse Project

2 Documents in Project

Summary

SCH Number
2015032041
Lead Agency
City of Folsom
Document Title
Final Initial Study/Mitigated Negative Declaration for the City of Folsom's Pump Station No. 1 Storage Basin Reuse Project
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2015
Present Land Use
Agriculture / Residential / Roadway
Document Description
Pursuant to the California Environmental Quality Act (CEQA; Public Resources Code Section 21000, et seq. and CEQA Guidelines), the City of Folsom (City) prepared a Public Draft Initial Study/Mitigated Negative Declaration (IS/MND) to evaluate potential environmental impacts associated with the City's proposed Willow Hill Pipeline Rehabilitation Project (Proposed Project) located in Folsom, California. The purpose of the Proposed Project is to repurpose the City's abandoned Pump Station No. 1 By-Pass Pond/Detention Storage Basin (Storage Basin) so that it can be filled in over time with clean native dirt from the City's water and sewer excavation jobs. Once filled, the facility will be returned to open space and let natural vegetation take over.

Contact Information

Name
Marcus Yasutake
Agency Name
City of Folsom
Contact Types
Lead/Public Agency

Location

Cities
Folsom
Counties
Sacramento
Cross Streets
E. Natoma Street
Zip
95630
Waterways
Napa River

Notice of Determination

Approving Agency
City of Folsom
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A