Willow Hill Reservoir Multi-Use Trail

3 Documents in Project

Summary

SCH Number
2015032010
Lead Agency
City of Folsom
Document Title
Willow Hill Reservoir Multi-Use Trail
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Open Space
Document Description
The City of Folsom proposes to construct a new multi-use natural earthen trail within the City of Folsom. The trail will be approximately 2 miles long and 6 feet wide and will be constructed by volunteers using hand tools and a small bobcat (such as a Bobcat 570 MINI). A single-span bridge will be constructed over the riparian area near the west end of the project (Figure 2). The bridge will be approximately 60 feet long and 6 feet wide with concrete abutments. The bridge will be made of pressure-treated wood and is proposed to be assembled onsite. This project has incorporated design features to avoid potential environmental impacts.

Contact Information

Name
Jim Konopka
Agency Name
City of Folsom
Contact Types
Lead/Public Agency

Location

Cities
Folsom
Counties
Sacramento
Cross Streets
Iron Point Road between East Bidwell Street and Prairie City Road
Zip
95630
Total Acres
1
Parcel #
072-1190-multi; 072-3120-multi
State Highways
Hwy 50
Schools
Folsom lake High
Waterways
Alder Creek
Township
9N
Range
8E
Section
7
Base
MDB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), Central Valley Flood Protection Board, Department of Water Resources, Office of Historic Preservation, Resources Agency, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Recreational (multi-use trail)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print