Initial Study for the Former Naval Petroleum Reserve No. 1 (NPR-1): Remediation of Areas of Concern (AOCs), including approval of cleanup plans for AOC 045, AOC
3 Documents in Project
Summary
SCH Number
2015031083
Lead Agency
Department of Toxic Substances Control
Document Title
Initial Study for the Former Naval Petroleum Reserve No. 1 (NPR-1): Remediation of Areas of Concern (AOCs), including approval of cleanup plans for AOC 045, AOC
Document Type
NOD - Notice of Determination
Received
Posted
8/12/2015
Present Land Use
Limited Agriculture (A-1)
Document Description
DTSC has approved two Removal Action Work Plans (RAWs) and an Interim Corrective Measures Work Plan (ICMW) for the former Naval Petroleum Reserve No. 1 (NPR-1) property (hereinafter "the Site") pursuant to Chapter 6.5 of the California Health & Safety Code. The RAWs and the ICMW consist of excavation of landfill material/debris and potentially impacted soil that may release chemicals of concern (COCs) at levels that may pose a risk to human health. The documents evaluate remediation action alternatives and identify a preferred action to address the Areas of Concern (AOCs) in the Corrective Action Consent Agreement, signed by the U.S. Department of Energy (DOE) and DTSC in 2008. The preferred remediation action alternative includes excavation of soil/debris and landfill materials at the AOCs.
Contact Information
Name
Michael Pfister
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Cities
Bakersfield, Taft
Counties
Kern
Cross Streets
28590 Hwy 119
Zip
93268
Parcel #
Various
State Highways
Hwy 119
Schools
Tupman ES
Waterways
California Aqueduct
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.