Kern-Tulare Water District Oil Field Reuse Project - Addendum to the Certified EIR
7 Documents in Project
Summary
SCH Number
2015021024
Lead Agency
Kern-Tulare Water District
Document Title
Kern-Tulare Water District Oil Field Reuse Project - Addendum to the Certified EIR
Document Type
NOD - Notice of Determination
Received
Posted
1/16/2019
Present Land Use
Various
Document Description
The proposed modified Project is to deliver produced water to existing crops within the District. The modified Phase 2 project description now consists of 11.2 miles of 15-inch pipeline that generally follows the existing approved pipeline route from the oilfield to just east of the approved section 35 Reservoir. At that point, the new proposed pipeline proceeds northwest to connect to the Guzman Reservoir. The outlet pipeline from the Guzman Reservoir will be increased from the 24-inch pipeline required for Phase 1 only to a 30-inch pipeline that will accomodate additional produced water available under Phase 2 of the project.
Contact Information
Name
Steve C. Dalke
Agency Name
Kern-Tulare Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Bakersfield, Delano
Counties
Kern
Cross Streets
State Route 155 and SR 65
Zip
93215
Total Acres
85
Parcel #
Various
State Highways
SR 155, SR 65
Waterways
Dyer Creek, Little Creek, and Five Dog Creek
Township
25S
Range
27E
Section
27
Base
MDB&M
Notice of Determination
Approving Agency
Kern-Tulare Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.