Stockton Reservoir Replacement Project
Summary
SCH Number
2015021023
Lead Agency
Ventura County Waterworks District No. 1
Document Title
Stockton Reservoir Replacement Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Agriculture and AE-40 Acres
Document Description
The proposed Project includes the construction of a new 1.0 MG reservoir at a site near the existing Stockton Reservoir site. The new reservoir will be an above-ground, welded steel tank, 80-feet in diameter, 30-feet in height with a knuckled roof. It is anticipated that the tank will be founded on a concrete ring wall and soil pad at an approximate elevation of 974 feet. There will be a concrete berm and asphalt road around the perimeter of the tank, and other ancillary features. A pipeline (420 linear feet, 12-inch diameter) from the new tank to connect with an existing 12-inch water line located in Stockton Road will also be constructed. The preliminary construction start date is April 2016 and completion is expected to occur by December 2016.
Contact Information
Name
Matt Grieger
Agency Name
Ventura County Waterworks District #1
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Moorpark
Counties
Ventura
Cross Streets
Stockton Road and Broadway Road
Zip
93021
Total Acres
.7
Parcel #
108-0-170-115
State Highways
Hwy 23
Waterways
Shekell Road Drain, Stockton Road Drain, Long Cyn Ck
Township
3N
Range
20W
Section
24
Base
SBB&M
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (Type water tank)
Local Actions
dev. approval
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.